Lake Mokoan Solar Farm

Lake Mokoan Solar Farm

Spanning across approximately 250 hectares of land, the Lake Mokoan Solar Farm will be located about 8km north-east of the Benalla township.

With a proposed capacity of up to 115 megawatts, the solar farm is expected to generate enough clean energy to supply 41,000 homes with electricity. This will assist Australia in minimising carbon emissions by 242,000 tonnes per year.

The project is currently under development and is envisaged to commence construction in 2020 and be fully operational in late 2021.

Proposed Capacity:
115 MWac

Households Powered:
41,000

CO2 Avoided:
242,000 t/Year

Investment:
$170 million

Expected Operation in:
Late 2021

Operation Life:
30 years